Current 0.0.11-dev order-review status

The four-layer working pill revision has 43 factory SMT placements / 18 SKUs, including eight Keystone 5015 / C2906768 service points. The four new bracket holes are optional M2.5 hardware anchors; modules/headers/screws remain customer assembly. J302 is removed. Use the freshly generated order ZIP; all 0.0.9 and 0.0.7 release/preview files below are historical.

First-article fabrication and assembly review package prepared. Submit the matched files for sourcing, DFM and a prototype quote. Physical first-article results are acceptance work after delivery, before repeat builds; they are not a prerequisite to ordering the prototypes. Checkout still requires supplier confirmation of exact parts, tooling and placement.

The 2026-11-09 public catalog snapshot reports:

Selected component LCSC Per board Standard-assembly stock
Keystone 5015 C2906768 8 77,077
C&K PTS636SK25SMTRLFS C2689642 8 0
Microchip SEC1210/PV-UR2 C633309 1 0
Amphenol 7312P0225A13LF C5417011 1 0

These are dated public fields, not a stock reservation. Overseas inventory is not confirmed assembly allocation. Resolve exact-MPN sourcing and attrition with JLC before paying or substituting parts. Supplier placement/DFM review must use the current board hash and matched compensated CPL, including all eight loops. Confirm the nominal 1.6 mm four-layer stackup. Native ERC/DRC and pinout checks are software gates; first-article fit, power/thermal/rail tests, correct carrier firmware, display operation and smartcard transactions remain required.

Rebuild with mise run variant:lcd:service:review and mise run variant:lcd:fab. The generated manufacturing/readiness.json records current stock blockers and file hashes. No order or account change is implied.

Historical 0.0.9 artwork review record

PCB first-article order readiness

The target is the main eight-pin pill carrier, 0.0.9-dev, with added denver.space artwork and the existing always-on backlight topology. This is an artwork revision of variants/lcd-module-2.8/, not promotion of the separate variants/lcd-backlight-pwm/ candidate. The target remains 35 fitted SMT pieces across 17 supplier SKUs; LCD, Luckfox, camera, headers and supports are separate.

Status: stock review required for five assembled boards. This document tracks the regeneration and assembler review gates. A new PCB hash invalidates the old package/preview association even when every electrical item is preserved. No order, payment or newly approved supplier placement is implied.

Current local regeneration result

The final artwork board SHA-256 is 59abf9a976ff8960a9f1f4c37245fe000f67a4bdce78db8634145cc372b2ace5. branding-audit.json proves the exact protected PCB tree matches the preceding board: all 60 footprints/200 pads, 538 tracks, 234 vias, zones, edge geometry, net assignments and export setup remain unchanged. Only permitted top-level silkscreen artwork differs.

Native ERC/DRC, unconnected and schematic-parity counts are zero. The refreshed geometry gate verifies 22 portable models and the retained manufacturer land patterns. Matched Gerber/drill/BOM/CPL generation passes at 35 placements across 17 SKUs; the three compensated positions remain the same. Fabrication screening and first-article process reports now carry this board hash. The power-budget report remains a planning calculation, not new physical evidence.

This closes local file/geometry regeneration gates. A new supplier upload/quote, placement/DFM approval, stock reservation and physical first article remain open.

Starting evidence

The pre-artwork 0.0.7 board has SHA-256 b4eb7a7cef3f026bfc332a19980727a165de9ea826e4eb25dcc68e2c458004b7. Before the artwork edit, this hash matched the native check report, fabrication capability report, first-article process report, assembly-fit report and supplier placement-correction record. Its Gerber ZIP, BOM, compensated CPL and population CSV matched the recorded file hashes. The BOM and CPL each identified exactly 35 fitted references across 17 BOM lines: 24 bottom-side placements and 11 top.

Those are file-consistency and geometry results, not evidence of powered hardware. The saved 0.0.7 supplier preview/quote is historical. Stock snapshots are dated, unreserved observations; they do not establish current orderability or pricing. Older feasibility-audit.json and power-input-review.json deliberately retain their original board identities and must not be relabeled as new audits.

Current supplier stock blocker

An exact-MPN lookup of all 17 selected SKUs on 2026-11-01 UTC found the following public standard-assembly fields. The socket record was checked at 01:17:44 UTC; these are dated observations, not a reservation. Proposed quantity remains five; no lower assembled quantity has been silently substituted.

Part Installed requirement for five canPresaleNumber overseasStockCount Decision
C5417011 / 7312P0225A13LF smartcard socket 5 2 9 Short by 3 before attrition; supplier sourcing confirmation required
C2689642 / PTS636SK25SMTRLFS switches 40 46 2,377 Installed count covered; final attrition/loading requirements unconfirmed
C633309 / SEC1210/PV-UR2 5 46 65 Installed count covered; final assembly sourcing unconfirmed

canPresaleNumber and overseasStockCount describe different supplier fields. Do not sum them or assume overseas inventory is available to this assembly job. Raw minimum/patch/loss fields are retained in stock-for-five.json; their final application to the actual quote must be confirmed by JLC.

Five fully assembled boards are not checkout-ready until JLC can source enough exact sockets and confirms attrition. Two visible sockets are not a promise of two assembled units. Manufacturing exports remain useful and internally matched despite this stock shortage. No substitute part or footprint change is proposed.

Gates before submitting the new package

Gate Required action
Exact target Record final 0.0.9 PCB hash and prove footprint/pad poses, nets, tracks, vias, outline and manufacturing datum are unchanged by artwork
Native checks Re-run schematic ERC, board DRC, connectivity/parity, pinout and mechanical gates; resolve findings rather than transferring old pass labels
Supplier compensation Re-review the three existing corrections against the preserved geometry and identities, re-pin the board hash, and reset the new-preview claim
Matched outputs Export Gerbers/drills and BOM/CPL from that same board; confirm 35 pieces/17 lines and exact reference/MPN agreement
Artwork Inspect top/bottom at fabrication scale for mask/pad overlap, clipping, readability, polarity labels and connector access
New supplier preview Upload the new Gerbers, BOM and compensated CPL together; inspect orientations and model origins without reapplying old manual moves
Factory preparation Obtain final DFM/placement review and rail/fiducial/tooling/stencil plan for double-sided assembly of this capsule
Parts Confirm exact selected MPNs, stock/attrition and all matched rows; explicitly include USB J301 if the uploader leaves it unchecked

The current exporters intentionally reject a changed PCB until placement compensation has been reviewed. Do not bypass that guard merely to obtain files.

Placement details to preserve

The CPL datum is (50, 130) mm in the native board. Exported X is native X minus 50; exported Y is 130 minus native Y. Bottom X is not mirrored in the CSV.

Ref Exact selected part Supplier compensation from native
J301 GCT USB4125-GF-A-0190 / C5246813 +0.84 mm Y, +180°
J601 Amphenol 7312P0225A13LF / C5417011 −0.8 mm X, +180°
U601 Microchip SEC1210/PV-UR2 / C633309 +180°

The generated upload CPL already contains these changes. The diagnostic native CPL does not. Do not apply a blanket bottom-side rotation: the green LED D302 needs no extra rotation, D301 is bidirectional, and top-side U701 is unchanged. Confirm USB mouth/tails/stakes, all numbered smartcard contacts and SEC1210 pin 1 in the new preview. Retain the old preview as explicitly historical evidence.

Saved manufacturer checks and physical limits

  • USB: the saved GCT drawing, page 1, identifies suffix 0190 as 1.90 mm shell stakes and provides the recommended six-contact land/slot geometry. This power-only connector has CC1/CC2, VBUS and GND contacts; its connector current rating is not the board's thermal or USB-negotiated supply budget. Review solder fill and the 1.6 mm PCB stack.
  • Switches: C&K PTS636 lists PTS636 SK25 SMTR LFS as 2.5 mm high with G-type terminals and 250 gf nominal actuation. Retain the selected exact part and matching footprint; a similar family name does not prove the plunger height or terminal geometry.
  • Controller: SEC1210 datasheet specifies the 24-pin QFN and grounded thermal slug. Preserve the /PV-UR2 purchase suffix. The hidden pad needs an assembly/inspection plan; electrical functionality alone does not inspect its solder joint.
  • LCD supply: AP2112 specifies 600 mA output capability and a SOT25 thermal figure under its stated conditions. That is not a guarantee of 600 mA at this board's voltage drop or enclosure temperature. The retained planning calculation reaches about 119 °C at 200 mA using 5.25 V input, 3.1 V output, 40 °C ambient and 184 °C/W; those assumptions are not a measured junction temperature.
  • LCD: HOTHMI drawing specifies the 88 × 53.3 mm module, eight-pin J1 interface and nominal 3.3 V operation, with operating supply limits of 3.1–3.6 V. Its 120 mA typical backlight figure is not the whole module current. BL_E high enables and low disables the backlight; always-on is the selected main-board default.

The existing geometry gate checks manufacturer land dimensions and portable model hashes. Drawing-derived envelopes are still approximations, not measured production assemblies. The LCD drawing's stack sums to 10.9 mm while other product prose gives 7.7 mm; verify the purchased revision physically.

Headers, power and first article

Before carrier power-up, use a reviewed carrier-profile image. The working base-fork bench image drives GPIO56/57 as LCD outputs, but those are Left/Up switch nets on this PCB. Pressing a switch can ground a driven output. See the included PCB/software compatibility audit for the exact mapping and LCD/reader configuration; no PCB rewiring is indicated.

Exact female/male header purchase MPNs and their contact-depth tolerances remain unselected. The CAD stack assumes 8.5 mm female housings, 2.54 mm pitch, 12 mm LCD spacers, approximately 5.04 mm LCD pin insertion and 6 mm Luckfox insertion. Those dimensions need a dry fit with the actual module headers before enclosing or repeating assemblies. Customer header work is not included in the SMT BOM.

J302 is an optional customer-fitted 2.54 mm 1×2 header: pin 1 is regulated +5 V, pin 2 GND. Use one supply source at a time. The design has no input source isolation or reverse-polarity protection. USB-C is a 5 V power input here; do not infer USB data support or higher-voltage PD negotiation from the connector.

A first article must establish LCD total current, LCD_3V3 startup/load-transient limits, regulator temperature at intended ambient/enclosure conditions, stable camera/display operation and reader behavior. The QFN paste pattern includes a central through-via: review wicking/voiding, stencil thickness and hidden-pad inspection. Do not remove that via casually; the retained removal experiment caused a native connectivity regression.

Order prototype quantities only after the file/factory gates above. Validate one physical unit before populating repeats. Software boot/QR results from the 240×240 bench setup do not qualify this carrier, LCD or smartcard circuitry.

Regenerate after the final artwork edit

First review/re-pin the placement-correction board hash and new package revision; then run from the repository root:

mise run variant:lcd:check
mise run variant:lcd:pinouts
mise run variant:lcd:models
mise run variant:lcd:fab
mise run variant:lcd:fab-audit
mise exec -- uv run python scripts/audit-first-article.py
mise run variant:lcd:power-budget
mise run variant:lcd:review
mise run variant:lcd:faces
mise run variant:lcd:package
mise run variant:lcd:stack

package must precede stack, which checks the exported GLB against the package manifest. After refreshed fit/check metadata is included in portable sources, run variant:lcd:package again so the final ZIP hashes cover those records. Do not publish a stale manifest copied from the previous board revision.

If distributing fit/case assets, also regenerate the hardware mesh cache, case-aligned fit kit, printable mockup and enclosure fit checks using their mise commands. Recheck the final package manifest after that sequence. Rebuild the static website from the new release metadata and review both PCB faces before uploading the new order bundle. Uploading the files and accepting the assembler's new preview remain separate from these local regeneration commands.


Source: docs/PCB-ORDER-READINESS.md ↗. Documentation describes reviewed evidence; it does not replace physical testing.